How Long Does It Take To Demolish A Kitchen?

How Long Does It Take To Demolish A Kitchen? Kitchen demolitions can feel like a big job. And to be fair, they usually are. There’s more going on compared to a bathroom — more cabinetry, more connections, more materials to deal with. At Small Space Demolition, based in Woolloongabba, this is one of the first questions we get when clients in Brisbane start planning a renovation: how long does it take to demo a kitchen? In most cases, a kitchen demolition takes 1 to 3 days. That’s the general range we work within. But like any strip-out, it really comes down to size, layout, and what we find once things start coming apart. Smaller Kitchens Can Be Done in a Day If the kitchen is compact and fairly standard, a full kitchen strip-out can sometimes be completed in a single day. We’re talking basic cabinetry, laminate benchtops, and minimal tiling. When access is straightforward and everything is easy to disconnect, the process moves quickly. These jobs are usually clean and predictable. That said, even smaller kitchens need a careful approach. There are plumbing, gas, and electrical components involved, so it’s never just a “rip and go” situation. Most Kitchen Demos Take 1–2 Days This is where the majority of Brisbane homes sit. If you’re asking “how long does a kitchen demo take?”, the answer is typically a day and a half, sometimes stretching into two. Cabinets need to be removed properly, splashback tiles chipped away, and benchtops dismantled. Then there’s what sits behind it all. Older adhesives, fixings, and layered materials can slow things down. Even something as simple as a tiled splashback can take longer than expected if it’s been installed well. Bigger or Older Kitchens Take Longer Larger kitchens — or older ones — tend to push the timeline out to 2–3 days. We often come across hidden issues during a kitchen strip out. Water damage under sinks, outdated wiring, or previous DIY work that needs correcting before anything else happens. It’s part of the job, especially in older Brisbane homes. Open-plan renovations can also add time. If walls are being removed or altered, demolition becomes more involved and needs to be handled with extra care. Access and Clean-Up Make a Difference Just like bathroom and other internal demolitions, access plays a role. Apartments, tight hallways, or limited entry points can slow down the removal process. Getting materials out safely and efficiently takes planning. And then there’s the clean-up. A proper kitchen strip out doesn’t stop at removal — we make sure the space is cleared, tidy, and ready for the next stage. What You Can Expect So, how long to demo a kitchen? For most projects, allow 1 to 2 days, with a bit of flexibility depending on the details. At Small Space Demolition in Woolloongabba, we focus on controlled, efficient kitchen strip-outs across Brisbane. No rushing, no shortcuts — just a clean slate, ready for your new kitchen to take shape. Big changes start with a Small Space We handle the Demolition, so you can Build your Future get free quote now testimonials
How Long Does It Take To Demolish A Bathroom?

How Long Does It Take To Demolish A Bathroom? Bathroom demolition always looks quick from the outside. It usually involves some noise, broken tiles, and suddenly, the space is stripped completely. But that’s not the reality. It takes a bit more time and a lot more care. At Small Space Demolition, one of the most common questions we get is simple: how long does it take to demo a bathroom? In most cases, bathroom demolition takes between 1 and 3 days. That’s a realistic range. But the exact timing depends on the size of the bathroom, the materials used, and what we uncover along the way. Small Bathrooms Take Just 1 Day Based on our experience, smaller bathrooms with a basic layout take just one day for a demo. Yes, it’s that quick. If the access is easy and there are no hidden issues, we can remove fixtures, strip tiles, and clear the space fairly quickly. Now, although it’s a smooth job, we don’t rush it. A clean, controlled demolition always sets things up better for the next stage. Most Bathrooms Sit in the 1–2 Day Range This is where most projects fall. A standard bathroom usually takes a full day, sometimes stretching into a second. If you’re wondering how long to demo a bathroom, this is typically the timeframe we quote. The biggest factor is tile removal. Wall tiles, floor tiles, and the adhesive underneath all take time to break down and remove properly. If the tiles were installed well, they’ll take longer to come off, which is something we see often. There are also waterproofing layers and built-up materials behind the scenes. You don’t see them at first, but they always need to be dealt with before the space is ready. Older Bathrooms Can Take Longer In older homes, demolition can stretch out to 2–3 days. That’s usually because of what’s hidden behind the walls or under the flooring. We often come across water damage, mould, or outdated plumbing that needs attention before moving forward. It’s not unusual — but it does add time to the job. We always take the time to deal with these issues properly, rather than rushing through them. Access and Clean-Up Matter Too A good demo isn’t about just breaking things down. It’s about cleaning, too. Removing debris is part of the job. Tight spaces or narrow apartments can slow things down. Additionally, the clean-up phase is done to get the site ready for the next step of the renovation. What You Can Expect Most bathroom demos take 1-2 days. But every project is different, so it all depends on the room we’re dealing with. That being said, the goal is always the same — to have a safe, efficient demo that leaves you with a clean slate to build on. A well-planned small demolition makes the rest of the renovation easier. As a Woolloongabba-based team, we handle bathroom and small-scale demolitions with a focus on precision and care. Big changes start with a Small Space We handle the Demolition, so you can Build your Future get free quote now testimonials
The Importance of Dust Control in Internal Demolition

Why Dust Control Matters in Internal Demolition To build something new, you must first tear down the existing. This is especially true for the kitchen, laundry room, or bathroom. Demolition of compact spaces presents numerous challenges that can only be handled by experienced professionals. Out of all the challenges, dust control is the one that deserves the most attention. At Small Space Demolition, we work with contractors, builders, and homeowners to ensure effortless demolition of compact spaces, while giving dust control the highest importance. If you are wondering why dust management in demolition is important, especially in internal spaces, read this blog until the end. Areas Where Dust Comes From During Demolition: Demolishing Walls And Partitions Demolition of internal walls and partitions accounts for the largest amount of dust release. Silica, found in construction materials like concrete, brick, stone, mortar, plasterboard, and tile, poses a safety hazard and must be dealt with urgently. This is where dust management in demolition proves to be useful. Dismantling Tiling and Plumbing Fixtures Tiles are held together with the help of grout and adhesive, which get exposed to the air during the dismantling process. Most plumbing fixtures are hidden within the walls. Be it plasterboard, cement, or bricks, when broken or disturbed to get to the plumbing fixtures, they become a heavy source of dust. Stripping Kitchen Fittings Or Ceilings Dispersion of fine dust particles is common when stripping kitchen fittings such as cabinetry, benchtops, ceiling panels, or wooden boards. The ceiling is one of the largest surface areas in any compact room. This makes it the largest contributor of dust during internal demolition. Ripping Carpet or Sub Flooring Dust, debris, grime, and mould get exposed to the air when ripping carpet or subflooring that has existed for many decades. Carpeting and subflooring rely on strong adhesives to keep them firmly stuck to the floor. However, with time, the adhesive stiffens and crumbles during dismantling. Why Dust Management in Demolition Matters? Professionalism If you are a builder or a contractor, leaving behind a pile of dust and debris doesn’t look quite professional. The clients won’t appreciate the trail of dust inside their homes, polluting not just the area you are working in, but also the others, which the homeowners might still be using. Dust management in demolition is a crucial practice that could protect your reputation as a builder or a contractor. Health Concerns Breathing in silica and other harmful particles won’t do you or your clients any good. Dust management alleviates health concerns like respiratory issues, eye irritation, and allergic reactions. Minimising airborne contaminants such as silica and asbestos is at the heart of dust management. Environmental Impact Without effective dust containment, harmful silica and dust particles significantly impact the local air quality. As a contractor, you have a moral and legal obligation to minimise the environmental impact during internal demolition. To ensure compliance as well as clean air in and around the demolition site, adhering to dust management practices is important. How Does Small Space Demolition Ensure Dust Management? When it comes to dust management, we spare no effort. Here are some ways in which we deal with dust during internal demolition. Floor Protection: Floating dust particles eventually settle on the floor. By using high-quality floor protection covers, we keep the floor from getting dirty. That’s not it! These floor covers also make debris removal effortless. No scope for dust or debris to recirculate in the air. Containment Zone: We set up zip walls and doors to contain the demolition site. Made of high-quality, durable plastic, the zip walls are an easy, efficient, and quick way to create a barrier around the demolition site. Air Purifier: We use Air Cube air purifiers to trap dust and contaminants during the demolition process. These high-quality air purifiers maintain a safe environment while the work is underway. Dust Removal: Small Space Demolition uses high-tech vacuum to get rid of dust and particles, leaving a clean, prepped area. Conclusion As we explained in this blog, dust control matters in internal demolition. From alleviating health concerns to protecting the environment and demonstrating professionalism, there are many reasons to take dust control measures seriously. Small Space Demolition uses air purifiers, industrial vacuums, floor protection coverings, and zip walls to ensure perfect dust control. Call 1300 33 66 87 or click here to request a demo today! We are the demo experts in kitchen, laundry, and bathroom demolition. Whether you are a builder or a homeowner, you can work with us, the best small demolition contractors, for unmatched results. Big changes start with a Small Space We handle the Demolition, so you can Build your Future get free quote now testimonials
How to Prepare Your Kitchen for a Smooth Demolition

How to Prepare Your Kitchen for a Smooth Demolition The kitchen is among the most important rooms in your home. From creating delicious meals to beautiful memories, the kitchen is where you spend quality time with your family. However, sometimes due to reasons such as a growing family, plans to sell the home, or an outdated design, homeowners want to invest in a kitchen renovation. Before renovation comes demolition, and how to prepare for kitchen demolition? Small Space Demolition is the answer. Our expertise in compact space demolition can greatly benefit you. Over the past ten years, we have worked with homeowners, builders, contractors, and renovation professionals. We offer controlled and efficient demolition of kitchens, bathrooms, and laundries. In this blog, we shed light on how to prepare for a kitchen demolition. Read till the end for interesting insights. Have A Clear Timeline Planning and scheduling are everything when it comes to kitchen renovation. Think of it, during the entire renovation process, you won’t be able to cook or dine in the kitchen. Having a clear timeline with a detailed process in place ensures the timely completion of projects. However, numerous contingencies arise during tasks such as demolition or construction. You must have plans in place to tackle those or risk missing the deadlines. Clear Out The Kitchen A clutter-free space is essential for a smoother and faster kitchen renovation. Things lying around the kitchen will make it difficult for the demolition and renovation specialists to do their work. The more things there are lying around, the more chances of unnecessary damage. Remove, neatly arrange, and label all the belongings in the kitchen to ensure a smoother restocking once the renovation is complete. Here are some areas or things that you must clear out in the kitchen Cabinets and drawers Benchtops and shelves Fridge, oven, and small appliances Dishes, cutlery, and pantry items Be careful not to damage cabinets, drawers, or appliances while clearing them out. Seek the assistance of experts if you must, like licensed electricians and plumbers, if need be. Set Up An Alternative Kitchen Space Depending on the area and complexity of your design, the kitchen renovation could take anywhere from days to weeks. Setting up an alternative kitchen space or station will mean you don’t have to order in every day until your newly renovated kitchen is ready. The temporary kitchen space doesn’t necessarily need to be fancy. Just have the basics like Table or countertop Basic utensils Microwave Gas or electric stove Turn Off Utilities The fewer obstacles to deal with, the faster the kitchen renovation work will be. Making sure utilities such as gas, water, and HVAC systems are turned off. Failing to do so poses significant operational and safety challenges. You must rely on demolition experts or licensed electricians to do so. Hire The Right Demolition Experts Hiring the right demolition experts can take a lot of burden off your shoulders. Let’s be honest, amidst our busy schedules, staying on top of demolition or renovation can be challenging. This is why you need a demo partner whom you can trust. How do you know whom to trust? Look for an expert with a proven track record. From asking your friends and family to doing online research, do all you must to confirm the reputation of the demolition expert you will eventually hire. How to Prepare For a Kitchen Demolition? Trust Small Space Demolition Small Space Demolition, situated in 46 Ipswich, Woollongabba, 4102, Queensland, is a name you can trust for compact space demolition. For the last ten years, we have been collaborating with homeowners and businesses throughout Queensland, delivering affordable demolition solutions. If you are a contractor, builder, or renovator, you can greatly benefit from our service. No gear? No problem. We bring the tools and the team for a seamless kitchen strip out and other compact space demolition. Why spend thousands of dollars on gear you will use a few times a year at the most? Instead, you can hire us for a fraction of the cost. No need for annual lung and mask checks for you or your staff! If an inspector conducts a spot check, your compliance documents are ready, and all protective gear is on hand for inspection. Small Space Demolition is the answer to the question of how to prepare for a kitchen demolition. Conclusion In this blog, we have discussed in depth how to prepare for a kitchen demolition and renovation. Having a clear timeline, clearing out the kitchen, setting up an alternate kitchen space, turning off the utilities, and hiring demolition experts are simple yet effective tips to prepare your home for a kitchen renovation. Call 1300 33 66 87 or click here to get a free quote. Big changes start with a Small Space We handle the Demolition, so you can Build your Future get free quote now testimonials
3 Must-Know Tips Before You Demolish Your Bathroom

Top 3 Must-Know Tips Before You Demolish Your Bathroom Outdated bathrooms dampen the aura of your home. If you plan to rebuild it, first you must focus on demolishing the existing one. What sounds relatively simple is actually very complicated and must be assigned only to experts. If you are a builder, bathroom renovator, or contractor, you could also benefit from a demolition expert. This is where Small Space Demolition comes into play. Over the years, we have worked with numerous homeowners, contractors, renovators and designers in and around Brisbane. Our specialised tools and equipment are best suited for demolishing tight, compact spaces without damaging other areas. In this blog, we list the top 3 must-know tips for bathroom demolition. Read until the end to learn more. 1. Check For Asbestos and Silica Everyone in the renovation, construction, and demolition industry is aware of the dangers posed by asbestos and silica if not handled properly. During demolition, these harmful materials can be released into the atmosphere, causing potential health and environmental risks. A detailed audit must be conducted to identify areas, such as walls and ceilings, with asbestos and silica, before proceeding with the work. From demolition to removal, Small Space Demolition handles asbestos and silica with utmost care. We will inspect the area and determine if tests are required. If the tests are indeed needed, we will order them on behalf of the client as part of our service. No more health, environmental, or compliance worries for you! 2. Prepare The Space in Advance Efficient planning sets the right base for seamless demolition. Protecting nearby areas and clearing paths for workers are all essential steps to prepare your bathroom for demolition. Items such as toiletries, mirrors, cabinets, and other personal items must be safely removed and stored. Use plastic sheets or drop clothes to cover the floor and furniture in the nearby rooms. Preparing the space in advance saves time, prevents unnecessary damage, and ensures timely completion of the project. 3. Hire A Professional Demolition Expert When it comes to compact space demolition, you cannot leave things to the amateurs. There are simply too many nuances, something that can only be trusted to an experienced demolition expert. They take the time to assess your bathroom before coming up with a plan and a detailed timeline. Here are a few factors that make demolition experts a priceless asset. -Experience, in-house employees with verified background -Use of proper tools and equipment-Fully licensed and insured-Safe waste disposal-Efficient operations-Prevents costly mistakes Trust Small Space Demolition For Effective Bathroom Demolition When it comes to compact space demolition, there’s no one better than us in and around Brisbane. From conducting detailed assessments to giving quick, transparent quotes, we spare no effort in making your demolition work easier. We work with homeowners, contractors, designers, and renovation specialists with equal dedication. Call 1300 33 66 87 or click here to talk to us or get a quote today! We are fully secured and accredited. We boast an exemplary fleet of demolition machinery and refuse haulage vehicles. Conclusion As discussed in this blog, following the tips for bathroom renovation in Brisbane can save a lot of time and effort. Checking for asbestos and silica, keeping plumbing fixtures safe, preparing the bathroom in advance, having a plan for rubbish removal, and hiring a demo expert are all things you must do to ensure seamless demolition. Small Space Demolition is a bathroom demolition contractor you can trust! Big changes start with a Small Space We handle the Demolition, so you can Build your Future get free quote now testimonials
The New Code of Practice and what you will need to implement if you don’t use Small Space Demolition

Blogs The New Code of Practice and what you will need to implement if you don’t use Small Space Demolition New construction silica Code of Practice – YouTube The new Code is Australia’s first silica dust code of practice for the construction industry and has commenced in Queensland on 1 May 2023. It applies to all construction work as well as the manufacturing of materials such as bricks, blocks, tiles, mortar and concrete. What you need to know and do To ensure you are up to date with the information you need, make sure you have done the following: 1. Go to Appendix 4 of the code and identify the equipment/task being performed. Example: stationary masonry saws (e.g., tile saws, brick saws) 2. Identify the engineering and work practice control method. This may determine if respiratory protective equipment (RPE) is required and therefore health monitoring. 3. Determine if the task being performed is for less than or greater than 4 hours. 4. Determine if the task is being performed indoors or outdoors and if RPE is required. 5. If RPE is required, PCBU to record the days worker wears RPE using the Appendix 5 Record of tasks for health monitoring trigger or other suitable recording method. 6. If worker is performing a task requiring RPE for 30+ days in 12 months PCBU to provide health monitoring. Refer to Section 10 of the code for health monitoring requirements. 7. Ensure you have your tasks, hazards, risks and controls are documented in your Safe Work Method Statements (SWMS). Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022 Complying with the Code PCBUs must adopt a risk management process, including eliminating exposure to RCS, so far as is reasonably practicable, or if it is not reasonably practicable to eliminate exposure to RCS, by minimising it so far as is reasonably practicable. To meet their health and safety obligations, PCBUs need to: Identify RCS hazards – see Sections 4 and 5 of the Code. Choose the right controls – see Section 6 of the Code. Monitor and review the controls – see Sections 9 and 11 of the Code. The Code outlines two methods for choosing the right controls: Method 1: Using the controls table. Method 2: Using exposure data to choose dust controls that work. Resources: Master Builders Qld, HIA Qld and Work Safe QLD Big changes start with a Small Space We handle the Demolition, so you can Build your Future get free quote now testimonials
How we handle your Silica Compliance and What We Do

Blogs How we handle your Silica Compliance and What We Do 1. New Silica Demolition Regulations are now being monitored 300 Inspectors on the ground in Brisbane as we speak doing spot checks. The new Code for the construction industry commenced on Queensland on 1 May 2023. It applies to all construction works as well as the demolition of materials such as bricks, blocks, tiles, mortar, engineered stone and concrete. 2. What does this mean for builders and workers performing demolition works in kitchens, bathrooms, laundries and outdoor living areas? a. Professionally fitted compliant Silica Masks for workers b. Medical lung monitoring for workers c. Installation of containment walls and doors around areas being demolished d. Air Cube purify machine to clean air in demolition confinement e. Dust shrouds or extraction apparatus on all power tools used for demolition f. Responsible transport and disposal of waste containing Silica APPROXIMATE COST TO SET UP AND REMAIN COMPLIANT………. Over $20000.00 to $30000.00!!! FINES FOR NON COMPLIANCE penalty per violation is $13,260 — or $132,598 in OSHA silica fines for wilful or repeated occurrences. Let Us Save You the Expense and Worry and do it For You ! Experienced team Qualified WHO and Supervisor Complete array of compliant equipment What We Do Cover floor areas external to confinement area being used for removal of spoil Set up Zip Walls and Doors to contain the demolition site Strip Walls back to frame Strip Floor covering back to base, including old tile beds and waterproof membrane Demolish stone bench tops Vacuum all dust and particles leaving clean prepped area Responsible removal and disposal of spoil Big changes start with a Small Space We handle the Demolition, so you can Build your Future get free quote now testimonials
Silica dust – are you health aware? what you will need to implement if you don’t use Small Space Demolition

Blogs Silica dust – are you health aware? what you will need to implement if you don’t use Small Space Demolition Employers, did you know it’s your legal responsibility to ensure your workers are trained in identifying hazards and the appropriate controls needed to keep them safe? In recent years there’s been a growing concern over the health impacts of exposure to silica dust. Silica is contained in many common construction products and exposure can result in severe medical conditions, such as lung cancer, Silicosis, kidney disease and chronic obstructive pulmonary disease.If you or your employees are working with concrete, tiles, block, stone or any materials that potentially expose them to respirable crystalline silica, it is tools down unless you have done the course, purchased all the now compulsory safety and extraction equipment. Fines are in excess of $10 000.00 and there are 300 new compliance officers on the ground as we speak doing random site checks. Respirable crystalline silica (RCS) While breathing in any quantity of dust is a health risk, silica dust is particularly harmful because the particles are small enough to be inhaled into the lungs. When inhaled into the lungs it can cause scarring and irreparable damage that over time leads to respiratory diseases such as silicosis, lung cancer and even renal failure.Respirable crystalline silica (RCS) is a hazardous substance, which requires a risk assessment to identify whether it poses a significant risk in your workplace. There is no recognised safe level of exposure to RCS but you mustn’t exceed the standard of 0.05mg/m3 in an eight-hour work day.You must monitor the air and workers’ health to determine levels of exposure and assess the risks for anyone performing ongoing work with silica containing products. Master Builders gets lots of questions about wearing respirable protective equipment, for example tight-fitting respirators and the legal requirement to fit test.Silica and dust | Master Builders Queensland (mbqld.com.au) Resources: Master Builders Qld, HIA Qld and Work Safe QLD Big changes start with a Small Space We handle the Demolition, so you can Build your Future get free quote now testimonials


